Crawler shot blasting machine must be installed step by step before operation, only properly installed in order to operate normally. After the user configures the concrete according to the local soil and checks the horizontal and vertical levels of the plane with a level, the crawler shot blasting machine can be installed and the bolts of each foot are tightened. Follow these four steps to install:
Safety Helmet Hat
Gloves
Installation tool
The crawler shot blasting machine has assembled the cleaning chamber and the shot blasting device into one before leaving, and the elevator and the elevator on the cleaning chamber are bolted. When installing the bucket elevator, attention should be paid to adjusting the upper end of the active pulley bearing seat to keep it level, so as to avoid the belt deviation;
This information comes from experience
Installation of separator. When the separator is working normally, there should be no gap in the projectile flow curtain. If the full curtain cannot be formed, the weight should be adjusted until the full curtain is formed. If the separation effect of the shot sand is not good, the separation stage can be adjusted to get a good separation effect, and the large material after the shot is screened should be removed regularly;
The elevator belt is connected by the user's matching hole.
Install the attached equipment drawings
Pay attention to safety during installation